Steps · Poured concrete

Poured concrete steps, formed to fit your entrance

When the entrance is wider, taller or more unusual than a mould allows — or you want steps and porch as one — poured concrete is built in place to the exact dimensions your house needs.

New concrete front steps with black aluminum railings beside a concrete retaining wall
Concrete steps, aluminum railings and retaining wall
Typical entrance
$2,500–$6,000
Time on site
2–4 days + curing
Concrete
32 MPa · 5–8% air
Shapes
Any width or layout

Built in place, to the millimetre

Poured — or cast-in-place — steps are formed on site, around your house, to the exact dimensions your entrance needs. That makes them the answer for anything a mould can’t do:

  • Wide entrances and double doors
  • Tall rises with more risers than a standard precast set
  • Deeper landings so the door can swing fully over a level surface, as the building code requires where a door swings toward a stair
  • Curves, wraparounds and turns toward a driveway
  • Steps and porch poured together as one entrance — see front porches

The spec we pour to

Exterior steps are named in CSA A23.1 exposure class C-2: plain concrete exposed to freeze-thaw and de-icing salts. The class sets three numbers that matter more than any sales pitch:

  • 32 MPa minimum strength at 28 days
  • 5–8 % entrained air
  • 0.45 maximum water-cement ratio

The Ontario Building Code requires the same 32 MPa, 5–8 % air (for site-batched mixes) and 0.45 ratio for exterior flatwork. We order a C-2 mix from the ready-mix plant for every exterior pour. Try the MPa guide to see how other applications compare.

How a poured step goes together

Day one — removal, base and forms. The old steps come out and are hauled away. We excavate past soft fill, then place crushed granular stone in compacted layers. Forms are built to your measured rise and run, so every riser is the same height. The building code allows only 5 mm of difference between neighbouring risers, and 10 mm across the flight.

Support and reinforcement. Steps with more than two risers get the support the code calls for: walls or piers to frost depth, or anchorage to the foundation wall. Steel reinforcement goes in to hold the stair together through decades of frost.

Pour day. The ready-mix truck delivers the C-2 mix. The concrete is placed and consolidated, screeded to the forms and floated. Then it’s finished with the texture you chose — usually a broom finish for grip. Edges are tooled. On a landing or walkway, control joints are cut at the right spacing so the concrete cracks where we want it to, not where it wants to.

Curing. New concrete is kept moist or sealed with a curing compound so it can gain strength. It reaches roughly 70 % of its strength in about a week. Forms come off once it can hold its shape. Railings go on once the concrete is ready to take anchors.

Finishes for poured steps

FinishGripBest for
BroomExcellentTreads, landings, walkways
Exposed aggregateExcellentTreads and landings with a natural-stone look
Integral colourGood (with broom)Matching brick or stone
StampedFair (needs grit + sealer)Landings and porches rather than treads
Quartz systemGoodCharcoal, grey or tan finished look over sound concrete

Poured or precast?

Poured steps take longer and usually cost more than precast for a standard entrance. You get total control of size and shape, and no boom truck is needed. If your entrance is a standard builder size and speed matters most, precast may be the better buy. The comparison guide helps you decide.

Timing your pour

Ottawa’s pour season runs through the warmer months. Below 5 °C, the building code requires the concrete to be kept between 10 °C and 25 °C during placement and at 10 °C or more for 72 hours after. And new concrete needs time to air-dry before it meets de-icing salt — Concrete Ontario recommends no de-icers at all in the first winter. Booking spring or early-summer pours gives your steps the best start.

What poured steps cost

A standard Ottawa front entrance with three to five risers typically runs $2,500–$6,000 before railings, or roughly $300–$800 per step for replacements. Wide entrances, tall rises, landings, removal and difficult access move the number. Price your layout in the step estimator.

Interactive MPa guide

How strong should the concrete be?

Pick an application to see the minimum strength, air content and why it matters in Ottawa.

Minimum 28-day strength

32MPa

≈ 4,640 psi

Front steps

Exposure class
C-2
Air entrainment
5–8%
Max water-cement ratio
0.45

CSA names steps and porches specifically in exposure class C-2 — plain concrete exposed to freeze-thaw and de-icing salt. That means 32 MPa at 28 days, 5–8% entrained air and a low water-cement ratio so the surface paste is dense enough to resist scaling.

CSA A23.1 Table 2 (C-2: garage floors, porches, steps…) · knowledge/concrete-facts.md F-MPA-01 to 03

Minimums from CSA A23.1 exposure classes, the 2024 Ontario Building Code (9.3.1.6–9.3.1.7) and Concrete Ontario's residential guide. Designs by an engineer or structural elements can call for more. We confirm the mix for your job in the written quote.

Check your stair

Rise, run, handrails and guards

Step code checker

Will your steps pass the Ontario Building Code?

Measure on the old steps or your plan. The checker treats the stair as exterior steps serving one house — the most common Ottawa front entrance.

    Based on the 2024 Ontario Building Code, Section 9.8. Rules can differ for multi-unit buildings, and the City of Ottawa has the final word on permits. Read the regulation.

    FAQ

    Poured steps: common questions

    How long until I can use new poured steps?

    Light foot traffic is usually possible after a day or two, depending on weather, but concrete keeps gaining strength for weeks — it reaches roughly 70 % of its strength in about a week, and its specified strength is measured at 28 days. We tell you exactly when it's ready for traffic and railings.

    What concrete do you pour for front steps?

    CSA A23.1 exposure class C-2 — at least 32 MPa at 28 days, 5–8 % entrained air and a water-cement ratio no higher than 0.45. That's the mix CSA lists for steps and porches exposed to freeze-thaw and salt.

    Do poured steps need footings?

    Under the Ontario Building Code, concrete steps with one or two risers may be laid on the ground. Exterior concrete stairs with more than two risers must be supported on concrete or masonry walls or piers, or cantilevered from the foundation wall — with foundation depth following the code's frost rules. We design the support for every job.

    Can you pour steps in the fall or winter?

    Poured concrete is best placed in the warm season. When the air is below 5 °C, the building code requires the concrete to be kept at 10–25 °C while placed and at least 10 °C for 72 hours after. Late-season pours also have less time to air-dry before salt season. For late-fall jobs, precast is often the better choice.

    What finish is best for outdoor steps?

    A broom finish or exposed aggregate — both give grip in wet and icy weather. We avoid a steel-trowelled smooth finish on exterior treads; it's slippery and, according to the NRC, hard trowelling of normal mixes weakens resistance to frost and salt.

    Free quote · Ottawa & area

    Let’s talk about your front steps.

    Tell us what your entrance looks like today. We visit, measure and give you a clear written quote — no pressure, no surprises.

    Get your free step quote

    We reply within one business day. No spam, no sharing your details.

    Capital Steps · Step guide

    Ask or search

    Answers come only from our verified knowledge bank — sourced from CSA A23.1, the Ontario Building Code, the City of Ottawa and Ottawa market research. If we don't have a verified answer, we'll say so.

    Popular questions