Concrete · Walkways

Concrete walkways that meet your front steps properly

Your front walk is the last thing your steps touch. Pour it at the wrong height and the bottom riser is off. Pour it without a proper mix and base and it scales and heaves within a few winters.

Wide concrete front steps with black aluminum railings and a centre handrail at a brick duplex
Concrete steps and aluminum railings at a duplex entrance
Concrete spec
32 MPa · 5–8% air · 0.45 w/c
Walkway
$12–$30 / sq ft
Bottom landing
Walkway can serve as one
City right of way
Driveway + walk ≤ 50% of frontage

Where the walk meets the step

For most Ottawa houses, the front walkway is also the bottom landing of the front steps. The Ontario Building Code requires a landing at the top and bottom of each flight. At the bottom of an exterior stair serving a single house, though, the landing may be left out if there’s no obstruction, such as a gate or door, within the lesser of the stair width or 900 mm (OBC 9.8.6.2). Ground that slopes no more than 1 in 50 at the top or bottom of a stair also counts as a landing (9.8.6.1). So a walk that runs nearly flat away from the bottom step does the job.

The walkway also sets the height of the bottom riser. The code allows risers to differ by only 5 mm from their neighbours and 10 mm across a flight. Where the bottom riser meets a sloping walk or driveway, its height may vary across the width of the stair by no more than 1 in 12. Pour a new walk 25 mm higher or lower than the old one, and a good set of steps can end up out of compliance.

That’s why we plan walks from the steps down. If you’re replacing your front steps too, we set both together. If you’re keeping them, we pour the walk to suit. See permits for front steps for when step work needs one.

The same exterior spec as your steps

A walkway gets shovelled, salted and soaked just like a step. CSA A23.1 names sidewalks as a class C-2 exposure, and Concrete Ontario applies C-2 to residential walkways: 32 MPa, 5–8 % air and a 0.45 maximum water-cement ratio. The Building Code requires the same for all exterior flatwork. Our MPa guide covers why.

Under the slab, we remove sod and topsoil, place compacted granular stone in layers, and slope the walk to drain away from the house without changing your lot’s approved drainage. Narrow walks need closely spaced joints. Panels should be no more than 1.5 times as long as they are wide, so a 1.2 m wide walk gets a control joint about every 1.2–1.8 m. Joints are cut at least a quarter of the slab depth, with an isolation joint where the walk meets the steps and the foundation.

Finishes for a front walk

FinishGripNotesBallpark
BroomGood, with fine ridgesThe exterior standard$12–$30 / sq ft
Exposed aggregateVery goodHides wear and suits older homesAdd $3–$5 / sq ft
Steel-trowelled smoothPoor when wetWeakens frost and salt resistance (NRC)Not used outdoors

Walkways in the City right of way

Part of most front yards is City right of way, and it may be wider than you think. In the right of way, the only hard landscaping allowed is a driveway and/or walkway, together covering no more than 50 % of the frontage.

Under Access By-law 2026-139, a separate residential pedestrian access up to 1.8 m wide needs no access permit if it meets the by-law’s criteria:

  • It stays out of a City tree’s root zone.
  • It’s at least 1.0 m from City infrastructure, 0.6 m from a hydrant and 1.8 m from a driveway.
  • It doesn’t cross a ditch or require changes to the curb or sidewalk.
  • It meets the by-law’s other criteria, which we check against your frontage.

Stairs in the right of way are often not allowed, which matters if your walk drops to the sidewalk. The City also requires hardscaping contractors who build walkways to be licensed. Ask any contractor for their licence. Digging also needs a free utility locate first.

What a concrete walkway costs

A concrete walkway runs about $12–$30 per sq ft in Ottawa, and small walks sit at the higher end. Replacing the steps at the same time? Old step removal runs about $300–$900 per entrance, and the step estimator below prices the new set. See the concrete cost guide and how we work.

Interactive MPa guide

How strong should the concrete be?

Pick an application to see the minimum strength, air content and why it matters in Ottawa.

Minimum 28-day strength

32MPa

≈ 4,640 psi

Walkway

Exposure class
C-2
Air entrainment
5–8%
Max water-cement ratio
0.45

Walkways are shovelled and salted just like steps, and CSA lists sidewalks in class C-2. Same spec, same reasons.

CSA A23.1 Table 2 · OBC 9.3.1.6 · F-MPA-01, F-MPA-08

Minimums from CSA A23.1 exposure classes, the 2024 Ontario Building Code (9.3.1.6–9.3.1.7) and Concrete Ontario's residential guide. Designs by an engineer or structural elements can call for more. We confirm the mix for your job in the written quote.

FAQ

Walkways: common questions

Do my front steps need a landing at the bottom?

Usually the walkway does that job. The Ontario Building Code lets a single-dwelling exterior stair skip a separate bottom landing when there's no obstruction, such as a gate or door, within the lesser of the stair width or 900 mm. Ground that slopes no more than 1 in 50 at the bottom of a stair also counts as a landing (OBC 9.8.6.1–9.8.6.2).

Can a new walkway change my step heights?

Yes. The walkway sets the height of the bottom riser. The code wants risers within 5 mm of their neighbours and within 10 mm across the flight, so raising or lowering the walk can push the bottom step out of line. We set the walkway height from the steps, not the other way round.

Do I need a permit for a front walkway?

Landscaping is on the City's list of projects that usually don't need a building permit. If the walk runs into the City right of way, though, a separate pedestrian access up to 1.8 m wide needs no access permit only when it meets the Access By-law's criteria. Together with the driveway, it can't cover more than 50% of the frontage.

Broom finish or exposed aggregate for a walkway?

Both work well on a C-2 mix. Broom finish is the standard and gives fine ridges for grip. Exposed aggregate is very grippy, hides wear and costs a little more. We don't steel-trowel exterior walks, because a smooth finish is slippery when wet and less resistant to frost and salt.

Can I salt a new walkway?

Not in the first winter. Concrete Ontario recommends no de-icer of any type on new concrete for its first winter, so use sand instead. After that, light use of plain rock salt is much gentler than calcium or magnesium chloride.

Free quote · Ottawa & area

Let’s talk about your front steps.

Tell us what your entrance looks like today. We visit, measure and give you a clear written quote — no pressure, no surprises.

Get your free step quote

We reply within one business day. No spam, no sharing your details.

Capital Steps · Step guide

Ask or search

Answers come only from our verified knowledge bank — sourced from CSA A23.1, the Ontario Building Code, the City of Ottawa and Ottawa market research. If we don't have a verified answer, we'll say so.

Popular questions