Service area · Riverside South

Front steps in Riverside South

Riverside South's first homes went up in 1996, once a new sewer opened the land to building. Those original builder steps are now approaching 30 Ottawa winters, and many are ready for a decision.

Freshly poured concrete driveway in front of a townhouse, taped off while it cures
New concrete driveway, curing
First homes
1996
2021 population
19,802
Oldest builder steps
Approaching 30 winters
New steps ballpark
$2,500–$6,000

Farmland waiting for a sewer

Riverside South looks new, and most of it is, but the plan behind it goes back a long way. From the late 1960s, Urbandale and Campeau (later Richcraft) assembled farmland in what was then Gloucester, including the former Birt, Caldwell and Larkin farms. For years the land sat largely as it was, because it couldn’t be built on at scale without major servicing.

That changed when a major sewer was completed in 1995. The first homes followed in 1996, and the community has grown outward ever since, mainly around River Road, Earl Armstrong Road and west of Limebank Road. Riverside South became part of the City of Ottawa with the rest of Gloucester in 2001, and by the 2021 census it was home to 19,802 people.

For front steps, that history gives Riverside South an unusually clear timeline. The housing here dates from 1996 onward, so the builder steps on the first streets are now approaching 30 Ottawa winters. That’s roughly the stage when many original sets start asking for a decision, while steps in the newest phases may only have a handful of winters behind them.

What 30 winters does to builder steps

Like most suburban Ottawa homes of this era, entrances here typically follow a builder pattern: a precast or poured set of a few risers leading to a small landing at the door, and often a shorter stoop on townhouse rows. Those designs work well when they’re new. Time, salt and soil movement are what wear them down.

On first-generation entrances, these are the things we check first:

  • Steps pulling away from the house. A gap opening between the top landing and the foundation wall usually points to a base that has compacted or settled. Ottawa’s Leda clay is known for long-term settlement, which is why we excavate and rebuild the base rather than set new steps on the old one.
  • Scaling at the nosings and the landing. The front edge of each tread takes the shovel, the boots and the salt. Once the surface flakes, the edge rounds over and starts to chip.
  • Rust staining or cracks running through the steps. Orange streaks mean water and salt have reached the reinforcing steel. Caught early, it’s often repairable; once the concrete around the steel is breaking up, replacement is the honest answer.

In the newer phases, the story is usually prevention. If your steps are showing early scaling, concrete repair or a quartz coating can deal with surface wear before it turns into a replacement.

Same footprint or a new design

Like-for-like precast. Builder entrances were laid out around standard precast widths, so a new precast set usually fits the existing footprint, meets the door sill and goes in with a single visit. On tight townhouse frontages, boom-truck access is the main thing we confirm on site.

Poured concrete is the route when you want something different: a wider set, a deeper landing the front door can swing over, steps that turn toward the driveway, or a small front porch poured with the steps. See poured concrete steps.

Interlock works well if you’re also redoing an interlock driveway or walkway; see interlock steps. For side doors and back entrances, wood and composite steps are often the practical choice.

If your new set has more than three risers, the Ontario Building Code requires a handrail between 865 and 1070 mm high. We quote railings with the steps so the anchors go into new concrete.

Permits, lot lines and locates

Riverside South is suburban Ottawa, so the City’s rules apply in full. Stairs and landings that provide access to the house can need a building permit, particularly where the landing is more than 600 mm above grade. A low, like-for-like replacement often doesn’t, but we check every job rather than assume.

Zoning matters if you want to grow the entrance. Steps and landings at or below first-floor level can project into the front yard but must stay at least 0.6 m from the lot line, and part of many front yards is City right of way, which can be wider than it looks. Before any digging, we book a free public utility locate through Ontario One Call, now Ontario Dig Authority, at least five business days ahead.

The concrete behind every set

Whether it’s a two-riser stoop or a five-riser entrance, the mix is the same. Exterior steps fall under CSA exposure class C-2: 32 MPa at 28 days, 5–8 % entrained air and a water-cement ratio no higher than 0.45, the specification built for freeze-thaw and de-icing salt. One- and two-riser concrete steps may sit on grade; sets with more than two risers need the support the Ontario Building Code requires, and we build to it.

Then comes the first winter. New concrete shouldn’t see de-icing salt in its first season, so use sand for traction and watch for salty spray from the street plough. You get a first-winter care card at the walkthrough.

Where we work in Riverside South

We serve all of Riverside South, from the original 1996 streets to the newer phases, along River Road, Earl Armstrong Road and the Limebank Road area, and on toward Findlay Creek, Manotick and Greely. Our in-house crew handles removal, base, steps, railings and finishing.

Wondering whether your original steps have more winters in them? Take the repair-or-replace quiz, price a new set in the estimator, or book a free site visit below.

Housing eras

How Riverside South was built — and what that means for its steps

  1. Late 1960s

    Urbandale and Campeau (later Richcraft) begin assembling farmland in what was then Gloucester, including the former Birt, Caldwell and Larkin farms.

  2. 1995–1996

    A major sewer is completed in 1995 and the first homes follow in 1996. Those first-generation builder steps are now the oldest in the community.

  3. Late 1990s–2010s

    The community fills in around River Road, Earl Armstrong Road and west of Limebank Road. Steps from these years range from mid-life to due for a closer look.

  4. 2021

    The census counts 19,802 residents. Newer phases have young steps that mostly need good care rather than replacement.

FAQ

Front steps in Riverside South: FAQ

How much does front step replacement cost in Riverside South?

Riverside South entrances follow the Ottawa-wide ballparks: about $1,800–$4,500 for precast steps including removal, and $2,500–$6,000 for poured concrete, before railings. A wider set or a deeper landing pushes the price up. The estimator gives a figure for your design.

Our house is on one of the original streets. Are the steps due?

Age is only part of it. Steps approaching 30 winters can still be sound, or they can have a failing base. Surface scaling on solid concrete is a repair job; steps that have tilted, sunk or pulled away from the house usually need replacing. The repair-or-replace quiz gives an honest first read.

Do I need a permit to replace builder steps?

Often not, when the new set is low and like-for-like, but stairs and landings that provide access to the house can need a building permit, especially where the landing is more than 600 mm above grade. We check the permit question on every quote. See permits for front steps.

Can we make the entrance wider when we replace the steps?

Yes, within the lot. Steps at or below first-floor level can project into the front yard but must stay at least 0.6 m from the lot line. A wider or reshaped entrance usually means poured concrete; our precast vs poured guide explains why.

Nearby:Front steps in Findlay CreekFront steps in ManotickFront steps in BarrhavenFront steps in Greely

Free quote · Ottawa & area

New front steps in Riverside South, done properly.

Tell us what your entrance looks like today. We visit, measure and give you a clear written quote — no pressure, no surprises.

Get your free step quote

We reply within one business day. No spam, no sharing your details.

Capital Steps · Step guide

Ask or search

Answers come only from our verified knowledge bank — sourced from CSA A23.1, the Ontario Building Code, the City of Ottawa and Ottawa market research. If we don't have a verified answer, we'll say so.

Popular questions